Thursday, April 17, 2014

DOING A LITTLE CATCH UP

I updated my 2014 quilts page today, as well as adding 2 items to the "Other Items" page.  I still don't have pictures of some of the larger quilts, but hopefully I will by next week!

I spent the past couple of days completing the quilting and bindings on 2 quilts that travelled north with pins - I just ran out of time to complete them.

 Cherry Pie Friends was made to finally use a collection of Mary Englebreit fabrics that had lived in my stash too long.

I used the "unstuffed piped binding" on this quilt.  It was machine stitched to the back first, then turned and stitched in the ditch between the main and accent colour, using invisible (monofilament) thread.
 I really like the tiny accent this adds to the binding, especially when it is matched to the final border.  I missed hand stitching the binding though - it almost felt like cheating!

 I also completed the quilting on another Boxy Stars quilt - pattern from Quiltville.com (Bonnie Hunter).  A couple of these blocks were leftovers from a group project that my southern quilt group worked on a year or so ago.  The 9-patch blocks that I used in the border, were made from my "leaders and enders" - also a Bonnie Hunter idea.
 One of the most difficult tasks I find, is how to quilt each quilt.  Since I hand-guide my quilts, and don't use a quilting frame, I can't do a pantograph style of quilting easily.  I also used an odd colour of thread - variegated between a medium purple to a gray-green.  I find it useful on many quilts!

 The 9-patch flower quilting is a "go to" design that I've used frequently.

These 2 along with a few others, will be donated to the community quilts group for my guild.  The group donates many quilts in our local community - wherever there is a need.

Monday, April 14, 2014

DESIGN WALL MONDAY

My sewing room is slowly getting back up to speed after returning north.  We've just finished doing our income taxes for this year - always a stressful time.

I needed something to stitch while things were in limbo, so I turned to Red Brolly's "Girls Own Stitching Club" project called Le Jardin.  
I prepared the first 4 blocks and started stitching with a bag of leftover embroidery thread scraps from cross stitch projects.




When we arrived home, I chose a light gray print for the applique pieces required for the next 5 blocks, using the "other side" of the fabric, to make it appear more muted.




 This is a great project to use various embroidery stitches.  Some are so rarely used, and I like being a bit challenged.
There are instructions included for all the stitches!






I'm enjoying some of the whimsical details from the designer's imagination.

Two more blocks to go......
Then I can assemble the blocks into a lovely spring-summer wall hanging.


Check out the creativity shared at Judy's blog, Patchwork Times.

 

Sunday, April 13, 2014

STASH REPORT SUNDAY

Fabric used this week  21.5 yards
Fabric used year to date  83.5 yards
Fabric added this week  0 yards
Fabric added year to date  28.5 yards
Net used 2014  55 yards

I finally finished my hexagon quilt, so I was able to claim all the yardage this week, although it was a 13 month project! 

 
This is the first picture of the finished quilt, although it doesn't show the borders.  I placed it on our bed as soon as the last thread end was clipped!  I machine quilted around each of the motifs.

Head over to Judy's blog, Patchwork Times, to see other quilter's stash reports for this week.

Tuesday, April 1, 2014

QUILTING DOWN TO THE WIRE

I'm looking forward to returning home soon, seeing family and friends, etc., BUT - I can't seem to stop quilting!

My hexagon quilt is about half quilted, and this afternoon, DH and I pin-basted 2 more quilts - one about twin size, and the other a bit smaller.  I had the backing prepared, and thought it would be easier to use the large tables in our clubhouse.

Tomorrow is my last day with the quilting group, but the hall is booked until the end of the month.  There are always a few trying to finish the last bit of their quilt projects.  When I get home, I'll have to start packing up my sewing room - I've just been regrouping items, trimming scraps into usable sizes, measuring leftover batting etc.  Our final few meals are interesting, trying to use up most of the food in the house.  Our left-overs will be passed along to neighbours, and finally get shared with some of the full-time residents.

The beds in our guest room are beginning to be piled with items that need to be packed.  The totes are lined up, ready to be loaded.  Once I start packing, it will all disappear quickly, then it is up to DH to fit everything in the van.  This year he has more equipment than ever before - golf clubs, 3 guitars in cases and 3 amplifiers, music and guitar stands, etc., etc., etc.  For the first time ever, I think his items are more bulky than mine!!!!!

Sunday, March 30, 2014

STASH REPORT SUNDAY

Fabric used this week  0.125 yards
Fabric used year to date  62 yards
Fabric added this week  14.5 yards
Fabric added year to date  28.5 yards
Net used 2014  33.5 yards
I had a busy shopping week, picking up backing fabric for 3 quilt projects!  My hexagon quilt is pin basted and ready for quilting, and the backs are prepared for my scrappy boxy stars, and my Mary Englebreit quilt.  Hopefully, I'll be able to get a bit of quilting done, but this is our packing week!  My little finish is a small sewing machine needle case.

I'm always shocked at how much "stuff" we travel with, both north and south.  I'm always happiest surrounded by all my favourite things, from sewing machines to kitchen gadgets.  Some are duplicates, but others travel in large totes in the van, along with golf clubs, thread storage containers, scrap containers, sewing machine, guitars and amplifiers - the list is endless.  Fortunately, DH is very organized, and prints lists so we don't forget anything.
Today is bright and sunny, and just perfect for DH's group's final performance for the season.  They are doing a free concert on the pool deck this afternoon, to share their music with all our friends and neighbours.

Head over to Judy's blog, Patchwork Times, to see everyones' stash progress this week!

Monday, March 24, 2014

DESIGN WALL MONDAY

As usual, I bring more projects south each fall, than I can finish, but I pulled one out yesterday, determined to take at least a finished top home.

Somewhere in my web browsing, I had seen instructions for this block: 

It began by layering 2 x 4 inch squares and stitching all four sides.
Then a line was drawn from corner to corner to form an X, and one layer was cut on the drawn line.  The triangles were pressed away from the centre square.
Next a 5 inch square was layered with the first step, sewn all around and cut on the drawn X again.
Since I had two different fabrics, I made 2 different blocks.  The only drawback to this block is all the BIAS edges, so care had to be taken when pressing.  The points are supposed to disappear too!
 I think the borders work well with the Mary Engelbreit panel that was in my stash.  I had collected several fabrics with cherries, bowls and chairs, and finally managed to use them in a quilt top.  I have more borders to add to this project to call it a completed top, but I should be able to get it finished before serious packing begins.


Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, March 23, 2014

STASH REPORT SUNDAY

Used this week  0 yards
Used year to date  61.875 yards
Added this week  0 yards
Added year to date  14 yards
Net used 2014  47.875 yards

I have been sewing this week, but didn't manage to finish anything..
I have my final appliqued borders attached to my hexagon quilt - just waiting for backing....
I added the final mitered border on my latest scrap quilt - also waiting for backing.

It looks like my numbers are going to get worse in the future before they get better!  I just found out that my favourite local quilt shop is having their next 30% off everything sale on the day we depart, and DH likes to be on the road 2 hours before they open!!!!

Hopefully I'll find backing fabric that I like in the next day or so.  I'd love to pin-baste my quilts before leaving, as I don't have easy access to large tables once I get back north, where there is still snow on the ground!

Check out everyone's stash progress at Judy's blog, Patchwork Times.

Friday, March 21, 2014

HEXAGON PROGRESS

I've been slowly adding the hexagon units to the final border for my quilt.  I am doing applique by machine, using monofilament thread in the needle, and a very narrow zig-zag stitch.  So far I have 3 borders completed, and the 4th is past the half-way point.  I can't wait to add them to the quilt!
Next, I have to find a suitable backing fabric for this project.  I attended the Sewing and Quilting Expo in Lakeland yesterday, but none of the fabric was just right!  I guess I'll have to check out a couple of quilt shops soon!

Thursday, March 20, 2014

SPINNING MY WHEELS!

That's what I feel like lately!  We had adult guests for over 2 weeks, and I managed to do a tiny bit of sewing, and attend my Wednesday quilt group.  Then we had friends visiting with 2 small girls.  We went to all 4 Disney parks over a 10 day period, with alternate days of shopping, swimming, mini golf, golf cart rides etc.  Needless to say, my cover remained on my machine for the duration of the visit, and I missed both Wednesdays, but everyone managed just fine at quilting.
It has taken me a few days to get caught up - laundry, cleaning, sleep, etc.  I managed to get to quilting on Wednesday, then out on an adventure with some friends today.  DH has been looking at our "closing the house for the summer" list, and has begun taking care of some of the items. We'll be hitting the road, van packed in just over 2 week!  

Where did the winter go?  (I know - we didn't have to suffer the endless snow and ice, but I'm sure there will be some left when we return!)

I have 3 of the 4 borders for my hexagon quilt ready to attach, and I was hoping to find some backing fabric today, but nothing climbed into my shopping bag today.  I also found out that my favourite quilt shop's 30% off sale takes place the day we depart......
I guess that means that a stop at Mary Jo's in Gastonia NC is in my future!

I still have a few days to sew before serious packing begins, so there is hope yet!

Sunday, March 16, 2014

STASH REPORT SUNDAY

Fabric used this week  0 yards
Fabric used year to date  61.875 yards
Fabric added this week 5 yards
Fabric added year to date  14 yards
Net fabric used 2014  47.875 yards

Sometime, during the past several weeks, 5 one-yard panels arrived.  I can't believe I didn't even turn my machine on for over 2 weeks, but having company, especially little visitors, took up all our time.  We had fun taking them to Disney World, and seeing their faces light up when talking to their favourite characters.  DH took them to the pool every day he could, and played mini-golf, took them for rides in the golf cart, etc.  I kept everyone fed, and tried to keep them organized.  I also edited the photos taken each day, and played games with the girls.
This is our second day of laundry and cleaning, and hopefully, I'll get my sewing mojo back by Monday!

Check out the stash reports at Judy's blog, Patchwork Times.

Monday, March 3, 2014

DESIGN WALL MONDAY

This was my finish for this week.
The pattern is the Versatile Wave pattern by Susan Rooney patterns.

This purse has two parts.  The inside pouch has a zipper opening and two interior pockets.  It has two buttons to connect the outer reversible cover.  The inside part can be carried as a clutch.
I added piping to the outer bag, and it has swivel clasps to connect the handles.  Glasses, cell phone, etc., can be placed inside the outer bag for quick access.  
The directions were well written, and I enjoyed making this purse.  I plan to make a better zipper pull when I return north - I have a huge box of beads and charms to use!

I won't be posting about my design wall for a week or two, as our little visitors arrive today, and DH and I will be BUSY!!!!!

Check out all the creativity at Judy's blog, Patchwork Times.

Sunday, March 2, 2014

STASH REPORT SUNDAY

Used this week 1.75 yards
Used year to date  61.875 yards
Added this week  0 yards
Added year to date 9 yards
Net used 2014  52.875 yards
 
My only finish this week was a small purse, which accounts for my fabric usage.
 
My days were taken up with house cleaning, laundry, grocery shopping, etc., following our first guests' departure, and preparing for the next set.
 
DH's group, 3 for a Quarter, had a successful performance yesterday afternoon, entertaining on the pool patio for neighbours and friends.  I was even persuaded to play 3 numbers on my flute, accompanied by DH on guitar and his partner on bass.  The weather was lovely, clear blue skies, light breezes, and warm temperatures.  The pool was busy, but people were singing along as the swam or sunbathed too!
 
I don't think I'll be getting much sewing done over the next 2 weeks, as we have 2 little ones visiting, but I do hope to attend the quilt show in Mt. Dora FL on the 8th.  DH has found a great park with a wonderful playground to entertain our small guests nearby....
 
Check out all the stash progress at Judy's blog, Patchwork Times. 

Friday, February 28, 2014

HEXAGON PROGRESS

I managed to finish all 42 of the large motifs and have 9 of the small flowers completed.  I can't wait to get them finished, and begin appliqueing them to the final border of my hexagon quilt.  This should make it large enough to fit on our bed, so I can sleep under all the beautiful colours!

Today DH is out rehearsing - his group is playing on the pool patio Saturday from 1-3.  He has persuaded me to do 3 numbers, accompanying him with my flute.  This afternoon, we head to the grocery store to re-stock for our next visitors.  Since we have little ones coming, I'm going to stock up on healthy snack items to take along on our outings.  I plan to do some baking over the next few days - cookies and squares for desserts.

Sunday, a quilting friend and her DH are stopping by for a quick visit.  They are approaching retirement, and want to see where we spend our winters.

I hope to squeeze a bit of sewing into the time as well.  I decided to put another border on the boxy star quilt, but don't have anything that will do, and I need some backing fabric as well, so that will have to wait until I can find the time to visit my local quilt shop!

Thursday, February 27, 2014

COMPANY GOING AND COMING.....


Our guests departed on Wednesday afternoon, so we've been catching up on chores.  DH has been busy, doing loads of laundry, cleaning bathrooms, helping to change beds and running the vacuum around.  Of course, my knee decided to have a "flare", just when it is the most inconvenient.  I've been doing as much as I can to help, but this knee issue is frustrating.

Our next set of company, our BFF's and their 2 granddaughters, age 4 1/2 and 6 1/2 arrive on Monday evening.  We have plans to go to Disney World with them (see why my knee flare is inconvenient?)
They will be here, arriving March 3, and departing March  14.

Our Godson, along with his parents are spending March 8-15 in Orlando, so we have to squeeze in a visit with them as well. 

More wonderful friends are staying nearby for the month of March, and we have to fit in a get-together with them, in between their many golf games as well.

Hopefully my knee will stand up to all the activities planned......

On the plus side, I've finished the 42 larger hexagon units, and have 4 of the smaller ones made.  I'm getting anxious to see this quilt top fully assembled!

Monday, February 24, 2014

DESIGN WALL MONDAY

I'm working on a scrappy quilt again.  The blocks are Quiltville's Boxy Star pattern.  Some parts were leftover from a previous group project, so I decided to make more for a small quilt.


 The nine-patches for the border were made from my "leader and ender" squares, stitched while making other quilts this winter.  I added triangle corners to each, using 2 alternating prints - the light wouldn't have been my first choice, but I have very little stash in my southern location.  Sorry for the poor perspective on the photo - I placed it on my driveway, and that was the best I could do to capture the whole quilt top.

 My finish for this week is a small wall hanging that will eventually be given to my SDIL2.  I plan to show it in my guild's next show in 2015, but I will let her see it when we return north. 
 Dragonflies are her favourite, and my son found a wonderful picture of one, that he printed poster size so I could use it for a pattern.  It took me a while to figure out how to transfer the pattern to the dark fabric.  My first thought was to use golden tracing paper, but since the wings are thread-painted with metallic thread, I was dreading the chore of removing all the bits of paper.  When having a tidy session in my sewing room, I found an old package of water soluble stabilizer.  I used a hot pink Frixion pen to draw all the tiny lines, then pinned the stabilizer in place over the appliqued body.  I stitched the wings with Superior's gold thread.

Visit Judy at Patchwork Times to see all the creativity this week!

Sunday, February 23, 2014

STASH REPORT SUNDAY

Used this week 1.625 yards
Used year to date  60.125 yards
Added this week  0 yards
Added year to date 9 yards
Net used 2014  51.125 yards

I finished a project this week that was a long time in the planning stages.  I thought about it for many months, finally figured out the design, then had to figure out how to transfer the design to the dark background fabric.   I did the decorative stitching a while ago, then had to think about how I wanted to quilt and finish this small project.  I was happy when I put the final stitches in the binding.  I still have to make a hanging sleeve and a label, but that can wait.  This will be a gift for a special someone in my life......
Check out everyones' stash progress at Judy's blog, Patchwork Times.

Friday, February 21, 2014

HEXAGON REPORT

29 of the 42 large units completed so far!
Another busy week with guests visiting, and Olympics to watch!

Monday, February 17, 2014

DESIGN WALL MONDAY

This wall hanging is about 40 inches square.  The tea pot blocks had been in my stash for a long time, but I think what stopped me from using them, was that there were only 8.  I decided to make a paper pieced block to round it out to 9, and found this one in my stash of patterns.  The original block was a mystery project from Paper Panache.  It was shared in time for Mother's Day a while back, and has a heart theme (handles, cup and tea pot lid).  There were also hearts on the pot, but I decided to make it all in print fabric instead.  I also used the same print for the binding.  Now I have to find a home for it!
Some things are difficult to photograph, and I find that embroidered blocks, especially those with lots of metallic thread are among the hardest for an amateur to do well......
All of the angel embroideries in this quilt were made with 3 shades of metallic thread, excluding their hair, skin and some small details.  The pot in the bottom right hand corner block is made of silver thread, and hardly shows at all. 

In person, this is a great quilt!  I decided to stop after the first border, but did add a narrow yellow accent strip to the edge before adding the binding.


Here's the star of the show!
 I just love the expressions on the sheep!  This is what attracted me to this project at first.







This project was designed by Natashia Curtin of Smee Designs and is found in the July 2012 edition of Australian Homespun magazine, available as an e-edition at Zinio.com


The designer's humour shows in every block.  My only complaint is that I was having such fun stitching the blocks, I was sad when I completed the last one!

Check out Judy's blog, Patchwork Times, to see all the shared creativity this week!

Sunday, February 16, 2014

STASH REPORT SUNDAY

Fabric used this week  7.75 yards
Fabric used year to date  58.5 yards
Fabric added this week  0 yards
Fabric added year to date  9 yards
Net used 2014  49.5 yards

We've had a busy week with company arriving on Monday evening.  DH's cousin and friend arrived, and we've been having a great time, getting to know one another again, sharing family stories, and just having fun.
Cousin P, a professional musician (guitar), has been having fun playing with DH and his friends.  His specialty is bass guitar, and he's been teaching our friend some new rhythms and little fingering tricks as well.
I did manage to get two projects completed this week!   I completed the quilting and binding on "Long Time Ago in Bethlehem", and then finished "Tea Anyone?" (I had completed most of the top up north, so I just had to add the final border, and quilt it!)   I haven't had time to take any pictures, so I'll try to get them taken so I can share them soon!
Check out the stash progresses at Judy's blog, Patchwork Times.

Friday, February 14, 2014

MORE HEXAGONS

I thought I was finished making hexagons, but after I appliqued the quilt to the plain border, I decided it needed to be a bit larger to fit our bed comfortably.  I thought about adding a pieced border, but didn't think it would add to the overall design.
My final decision was to make a second plain border, using fabric similar to the final background hexagons used in the quilt top, and then add two alternating hexagon motifs , appliqued to the final border, to finish the quilt.
So now I am back making 42 flower motifs, and 42 lozenge motifs.  I had been complaining to DH that I didn't have any hand stitching to do while watching the Olympics, so now that problem has been solved.

Monday, February 10, 2014

DESIGN WALL MONDAY

I've been busy getting ready for company arriving this evening.  Both DH and I use our guest room as extra storage - me for quilt stuff and DH for guitars, amplifiers, stands, cables.  We had to be very creative to find accessible storage for all of the items, so our guests will have a room to themselves!

I decided to use the blue fabric with stars that I bought recently, to use as sashing around the embroidered blocks of "Long Time Ago in Bethlehem".  I couldn't find any pale colours with small stars, but I did get a buttery yellow with small polka dots.

  After looking at the completed top, I decided to finish it without the remaining borders in the original design.  I'll be using the same blue for the binding, so I machine basted a small folded strip on each edge to provide a small accent.
 I've been making hexagon units while watching the Olympics.  I want to plan the final appliqued border for my hexagon quilt, so I know how many I have to complete.

Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, February 9, 2014

STASH REPORT WEEK 6

Fabric used this week  0 yards
Fabric used year to date  50.75 yards
Fabric added this week  0 yards
Fabric added year to date  9 yards
Net used 2014  41.75 yards

Nothing completed this week - two days were too cold to sew in my room, the weather was cold and rainy for the south.  Nothing like family and friends are suffering at our northern home!

I added the sashing between the embroidered blocks for "A Long Time Ago in Bethlehem".  The original pattern had two of the blocks without sashing on the outside edge of the quilt top, so I adjusted some of the block sizes and added it.  When it was finished, I decided that the quilt is large enough for a wall hanging, so I'm not going to add any more borders.  Now I have to hunt for some backing fabric in my small stash.
Then I decided to work on finishing my hexagon quilt.  I cut the remaining burgundy fabric in strips to add a straight border to the outside edges, and spent 2 afternoons machine appliqueing the top to the border.  After measuring the top, I've decided that it needs to be larger, so I've decided to add an additional border, and I'm back to making motifs that will be appliqued to the final border to bring the hexagons to the outside of the quilt.
DH's music partner found 2 hats to add to their performance wardrobe, but they need new hat bands.  His wife found some great black and white musical striped fabric, so I'll be cutting some bias strips to dress up their new hats.
Check out Judy's blog, Patchwork Times, to see all the progress made this week!

Monday, February 3, 2014

DESIGN WALL MONDAY


I almost forgot to post!  I was busy completing the quilting and stitching on the binding of the final baby quilt that I'll be making for a while.  I donate most of them to my guild's community quilts program, to be donated in our community and many other places as well.
 I pick up panels whenever I find ones that I like and are on sale!  The yard size ones are becoming more scarce as most of the manufacturers are make panels only 24 inches wide by the width of the fabric.  I often pick them up from clearance sales, so the chance of finding the coordinates is slim to non.  I still have a small collection to work on, and find them wonderful to flex my free-motion machine quilting muscles before starting a new project!  The third in the group will have its binding stitched while watching TV with DH tonight.
I think I really have to figure out how to finish my hexagon project.  I like to add a straight border to the outside edges, and machine applique the hexagons to the border.  I only have small amount of the dark burgundy fabric I used as a hexagon border in the project, so I may only be able to make a narrow straight border, then decide how to finish the edge.....  Our southern weather has been strange this year, and we went from a high of 39F a couple of days ago, to 89F today.  My sewing room was comfortable this morning, but is mighty hot this afternoon, even with breezes and a ceiling fan - too hot to think clearly for a northern girl like me!
Maybe I'll square up my embroidered Christmas blocks and get them ready for sashing etc!
Check out the creativity shared at Judy's blog, Patchwork Times.

Sunday, February 2, 2014

STASH REPORT SUNDAY WEEK 5

Fabric used this week  5.75 yards
Fabric used year to date  50.75 yards
Fabric added this week  9 yards
Fabric added year to date  9 yards
Net used 2014  41.75 yards 

My trip to the Suwannee Valley Quilt Shoppe on Wednesday was fun.  I helped a couple of people choose fabric for their projects, and even got some for mine!
These two will be used in my embroidered project, A Long Time Ago in Bethlehem.
I am always attracted to diagonal stripes, and these 3 had to come home with me.  They make wonderful bindings!
Of course, this wonderful striped fabric caught my eye - the colours are so rich,with the metallic gold accents!






 We are going to our neighbours' home for a superbowl party later today.  I have no interest in football, but when I tried to stay home one year, Mrs. neighbour visited me every half hour, bringing food and snacks, and I didn't get anything done!
I still don't have a full picture of my Chocolate, Strawberry and Vanilla quilt, but did take one on our bed....
Our home is tiny, and it is difficult to step far enough away to take a good picture.  I'll try to get DH and a friend to hold the quilt for a proper picture soon.....
Check out all the stash reports for this week at Judy's blog, Patchwork Times. 

Monday, January 27, 2014

DESIGN WALL MONDAY

This is block 8, called "Keep It Down!"  I am working on the final block to complete "A Long Time Ago in Bethlehem".  I didn't stitch them in order - I cut the largest pieces of fabric first, to make sure I didn't have a seam anywhere, then cut the rest, making the best use of my background fabric.  My quilt group is going on an "outing" to a shop about 2 hours away on Wednesday, so I hope to find fabric for the sashing between the blocks, so I can assemble the centre of the wall hanging.  I think that the rest will wait until we return north in April, as I'm sure I have lots of fabric in my stash to complete the quilt.  I'm trying to use up my huge stash of Christmas fabrics....
Check out Judy's blog, Patchwork Times, to see all the creativity this week.....

Sunday, January 26, 2014

STASH REPORT SUNDAY WEEK 4

Used this week  23.625 yards
Used year to date  45 yards
Added this week  0 yards
Added year to date  0 yards
Net used 2014   45 yards

My version of Bonnie Hunter's Smith Mountain Morning has about 6 inches of quilting remaining to finish, so I'm calling it DONE!  I began working on it in November when we arrived at our winter location, but other things kept interfering!  My version is queen size and in pink, white and brown.  I'm calling it Chocolate, Strawberry and Vanilla, Oh My!
I also completed a baby quilt for my guild's community quilt program, made from a panel.  It was my warm-up quilt, to get my mind and muscles ready to machine quilt!
I love weeks like this, when I can finally report on a big finish....

This Wednesday, some of my quilt group are travelling 2 hours north-west to visit a beautiful quilt shop - I'll take pictures and report on our visit.....  This will damage my great numbers, but I do need some fabric to complete my latest embroidered project.

Check out everyone's progress at Judy's blog, Patchwork Times.

Thursday, January 23, 2014

MY WEDNESDAY QUILTING GROUP

At this time of year, we start to see some finishes my members of my quilting group.  I'd thought I'd share some candid shots of some of the projects.
This wonderful applique quilt was made by a fairly new quilter, who said that when she began the project, she didn't know enough about quilting to understand how long it would take to complete.  All the appliques were made with the freezer paper method, with turned under seam allowances and then machine satin stitched.  She had it professionally quilted - a work of art!
A close-up picture that shows the quilting better.  I wish I had taken this without the flash, but I was using our old camera, and I didn't remember how to turn it off!
Another fairly new quilter finished this lovely batik log cabin quilt.  She just received it back from the quilter, and was hand stitching the binding.






She chose a quilting design with a dragonfly to echo one of the the fabrics in the top.  Once again my flash washed out the color of the backing fabric. 




This black and white quilt top was having borders added... 








Here is a completed pinwheel stripe table runner, followed by one in progress.

There were many more projects in various states of completion, but since I was helping everyone with their questions, I was unable to photograph them all.













Monday, January 20, 2014

DESIGN WALL MONDAY

I have completed the stitching on 4 more blocks for the "Long Time Ago in Bethlehem" quilt project.
 
Block 12 is the smallest - called "Hark"



 
Block 9 is called "Spotlight Angel"












Block 11 is "Eggsellent Advice"





Block 10 is "Glory of the Lord".  This is the block I saw that MADE ME want to stitch this project!  Every time I look at the sheep, I smile!


I pin-basted a small baby quilt panel, and I've almost finished the quilting, so I should have it completed for next week's report!.

Head over to Judy's blog, Patchwork Times to look at this week's creativity

Sunday, January 19, 2014

STASH REPORT WEEK 3

Fabric used this week  0 yards
Fabric used  year to date  21.375 yards
Fabric added this week  0 yards
Fabric added year to date 0 yards
Net used in 2014  21.375 yards
No finishes this week, but also no new fabric.  I've been working on a wall hanging that has been in the planning stages for 2 or 3 years.  I've also been stitching my "Long Time Ago in Bethlehem" blocks during the evenings.  My sewing room has no heat or air conditioning, and we've been having cold temperatures overnight - almost frost - so I don't sew until my room is a reasonable temperature, which can be as late as 1pm!  It sure cuts down my available time.  I did manage to get my brown, pink and white quilt pin-basted, but discovered an error in one block, so I have to remove the corner unit, and sew it in the correct orientation!
Friday we went to visit friends in their new home near Leesburg FL, travelling with 2 other couples (they had all worked together at Tyndall AFB).  Their community is lovely, as is their home.  They've been redecorating since they moved in, including a new kitchen, tile floors, etc. 
Head over to Judy's blog, Patchwork Times, to see other quilters' progress this week! 

Monday, January 13, 2014

DESIGN WALL MONDAY




I've kept busy this week finishing projects and doing some machine quilting during the day, and stitching blocks for "A Long Time Ago in Bethlehem" during the evenings.  I love the look of the metallic thread, but it is a bit of a struggle from time to time.  The silver looks wonderful in person, but doesn't photograph well.

I love the humor in each block - the designer did a wonderful job!

This block is titled "Which Way?"
The "Mice Burglars" are having fun with the gold, frankincense in the chest and mhyrr in the silver bottle.....

Check out Judy's blog, Patchwork Times, to see what other quilters are playing with this week.