Friday, May 8, 2015

BUSY FEW DAYS

Busy, but no sewing!  Mama Mallard is still sitting on her nest.  We try to be quiet when coming and going, but she is getting used to us.  We check on her, but we're anxious to see how she'll get those babies to water when they hatch.

Monday was dental check-up day.  Tuesday I spent some time packing my quilts and other items that I needed for our guild meeting on Wednesday.  Then I wrote the message about our quilt photography days, and sent copies to both guild reps to send to all the members.

Wednesday morning DH and I had our annual check-ups.  Still have to find time to see the local vampires for blood-work!  My brother and his wife are visiting Canada from China, so Wednesday afternoon they arrived to spend a couple of days with us!

Since Wednesday was my guild meeting I took her along.  She had fun talking to many of the members, and took lots of pictures of quilts too!  As soon as we returned home, she sent pictures to all her friends in China, and spent the rest of the evening and part of the next morning answering questions.  It was our second last meeting before the big show - so there was lots of quilt show info shared.  We also had a great guest speaker with lots of quilts in her trunk show.

Thursday morning we decided to go on a Thousand Islands cruise.  They only have one boat running this early in the season, and only the 1 hour cruise, but the weather was awesome - warm, blue skies and light wind - a perfect day for a sail.

 






 
Part of our trip was through the smaller channel, used by pleasure boats.  The large channel is used for large ships travelling from the great lakes to the gulf of St. Lawrence and beyond.  We passed large homes, and tiny cottages.
 









We sailed under the northern span of the bridge to USA.  It connects Highway 401 in Canada to Interstate 81 in New York State.







We sailed around Heart Island so we could view Boldt Castle from all sides.  Our cruise lasted for an hour.  The longer cruises don't start until June.  If you wish to visit Boldt Castle, you have to take a boat from the US, usually at Alexandria Bay NY.


We went out for dinner to a local favourite that has been open for 50+years.  Both evenings the "guys" watched the hockey games - my brother's favouite pasttime.

All too soon, if was Friday morning, and they were heading off to Gatineau, Quebec, to visit friends there for a day or two.  As soon as they left, DH and I met another guild member at the guild's storage locker to get 2 quilt stands and one backdrop for use during our photography sessions.  I'm having pretty good response from quilters, and have quite a few sessions booked.  I've tried to remind them that they can bring as many quilts as they have ready, even if they are still stitching the hanging sleeve on some of them.  The more quilts we photograph early, the fewer last minute edits I have to make, and maybe I won't be one of the walking dead (from lack of sleep) during the whole show!

If you are in or around the Kingston ON area, please plan to attend "Quilts Kingston 2015" June 12, 13 and 14.  There will be over 280 quilts and other items on display!

Monday, May 4, 2015

SIGNS OF SPRING

This is a picture of the front of our townhome, with a few green sprouts in the garden area.  We live in close quarters with our neighbours too.

When we returned north, we noticed Mr. and Mrs. Mallard were strolling past our back garden area.  

A few days later, DH was raking the gardens, preparing to add new mulch, when he saw this peeking from under our Alberta Spruce.
Our next-door neighbours have 3 children, so there is lots of coming and going from their side.  At first, she would be frightened away, but now she watches cautiously, and has even added more eggs to the nest - there were 2 when DH was raking.  We're trying to keep from going past as much as possible.  Our only question is how she is going to get the little ones to water after they hatch.

Sunday, May 3, 2015

STASH REPORT SUNDAY

Fabric used this week  3.875 yards
Fabric used year to date  89.875 yards
Fabric added this week  0 yards
Fabric added year to date  62.75 yards
Net used 2015  27.125 yards

I've been AWOL the past couple of weeks.   Life is always busy when we return to our northern home.  We've had 2 trips to our DS2's home (4 1/2 hours away), helping our family build raised beds for a small veggie garden, and reorganizing their shed, garage and under-stairs storage area.  Of course, there was lots of snuggle time with our grandson D.

On the home front, I've been catching up with cleaning and laundry, and getting ready for my guild's quilt show in mid-June.  DH and I look after photographing all the quilts in the show, and producing a CD for sale at the show.  In previous years, we've done all the photography while the quilts are being hung, and as everyone knows, it is difficult to get good pictures, due to placement, lighting, etc.  I've spent a while this week finding and arranging for places to do some of the photography before the quilts have to be handed in on June 2.  After many phone calls, I've finally arranged for 2 daytime and 2 evening sessions.

I've also been adding sleeves and labels to my quilts that will be in the show, and I made 8 more luggage tags for the boutique.

Our next guild meeting is Wednesday, and I'm in charge of the social committee for the month.  The group brings snacks for the break, and provides help during the meeting at registration, show and tell, community quilts, the library, and assisting the guest speaker.  Each group is named after a quilt block, and since May is the Bear Paw group, I made 3 inch blocks in spring flowers for each of the members to wear at the meeting.  Those items account for my fabric usage this week.

Check out the progress shared at Judy's blog, Patchwork Times.

Tuesday, April 21, 2015

STASH REPORT SUNDAY

Fabric used this week  3.375 yards
Fabric used year to date  86.5 yards
Fabric added this week  0 yards
Fabric added year to date  62.75 yards
Net used 2015  23.75 yards

I'm a bit late with my report - I was snuggling my new grandson for the past 4 days!

This week I completed one NICU quilt and 2 snap bags.  Now I have to get busy and add the hanging sleeves on all my entries for the upcoming Quilts Kingston 2015 show in June.  I also have to make cloth bags for transport and storage, along with labels on everything......

Our weekend visiting DS2 and his lovely family was fun.  I enjoyed getting acquainted with our 3 month old grandson, D.  On Monday, I stayed home and his Mom and Dad went with DH to run some final errands.  This is the first time my DDIL has been out without D since his birth!

We helped with some gardening and DH installed cabinets in their garage, and moved shelving to better locations for their use.  They also built 2 raised beds for veggie gardening.  Apparently, rabbits are populous in their area, so their new beds are 2 feet high x 4x6 feet in size.  (I'll remember to get pics next visit).  Now they have the fun of filling them.  There are 2 compost bins in their yard, so all of the contents will be placed in the bottom of the bins, then covered with layers of topsoil, peat moss, manure, etc. to make a good gardening mix.  DS2 will be working for a while on that task! 

 The last frost date in our area isn't until May 24th, so we hope to make another trip before then to help with more gardening.  There were little green sprouts showing in most of the flower beds, so it will be interesting to see what is already there.....  I have lots of iris and daylilys that need to be divided, so I'm sure we'll find some places to share them.  They are planning to start small, so if they only get one garden bed completed in time to plant, they can work on the second for next year.

Check out all the shared reports at Judy's blog, Patchwork Times.
 

Thursday, April 16, 2015

SOME SMALL FINISHES

I couldn't wait to get my sewing machine set up again.  My guild's community quilts group had been asked for some premie quilts for our hospital's NICU , only 24 inches square.  I prepared 3 tops and backs, then I called our committee head, to ask what if any, batting was being used.  Since this is new for our group, they were making samples using different layer and battings, but needed one made with poly batting.  They will be sent to the NICU so that they can decide which type they prefer.  I quickly quilted one of the three tops, and stitched binding to the small quilt.  I delivered it to the committee head at our guild executive meeting last night, and they will be delivered to the hospital on Friday.

While organizing all my fabric returning to my sewing room, I found some extra block parts from my mystery quilt.  I was able to made 4 blocks, so I decided to make 2 snap bags for our upcoming quilt show.  I found the extra matching fabric to make the pull tabs and lining, and pulled out my serger to clean-finish the final seams, so they are ready to go!

Next on my agenda is to complete some chicken soup.  We picked up 4 whole chickens, and I cut them into parts for the freezer, saving most of the skin and remaining bones with meat attached.  On Tuesday I simmered the stock and then strained it into some containers, and picked the meat from the remains.  Yesterday, I removed the fat from the stock, so it is ready for all the extras - yummy vegetables and herbs.  DH and I enjoy homemade soup for lunch most days, and I like to control the fat and salt content, while making tasty soup!    

I also plan to pull out some of my novelty prints to make luggage tags - another requested item for the quilt show boutique.  While looking, I'll set aside any large enough pieces for pillow cases for my southern quilt group's pillow case day next February.  This should help with my stash numbers!

Monday, April 13, 2015

DESIGN WALL MONDAY

My sewing room is almost back to normal, and I just had to sew today.  Recently, my guild's Community Quilts group received a request from the NICU unit at our local hospital, for some premie quilts 24 inches square.  I had taken 2 old 1/2 yard panels south a couple of years ago, and wasn't inspired, but when I was putting fabric away, inspiration hit!  Each panel had a small wallhanging piece and 2 parts to make a tiny pillow.  This will be my first NICU quilt - after adding sashing and borders, and I'll use the stripe for binding.  More to come.....

Also, while I was putting things away, I found some leftover block units from a winter project, and stitched them together to make 4 blocks.  I'll be using these to make small "snap bags".




Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, April 12, 2015

STASH REPORT SUNDAY

Fabric used this week 0 yards
Fabric used year to date  83.125 yards
Fabric added this week  0 yards
Fabric added year to date  67.75 yards
Fabric used year to date  20.375 yards
 
I've been AWOL for a while, relocating north for the summer.  We had a safe trip, although the final 2 days were gray and overcast.  We stopped at the Martin Guitar factory in Nazareth PA on the way home - great museum and free factory tour - well worth the stop!
I still have one more tub to unpack, as well as my sewing machine.  I'll also have to unpack fabric and find a place for the quilts I brought home, until they go to their new homes.  We picked up enough groceries to manage for a few days, and I hope to be back sewing tomorrow!
Our van was so loaded that I passed on visiting some fabric shops in the Lancaster area - I wasn't sure where we would put any additions!  We can always head that way next fall...... when I have a list!
Next weekend we are visiting DS2 and his wife, so I can hold my grandson for the first time!!!!!!
 
Check out all the reports shared at Judy's blog, Patchwork Times.

Saturday, April 4, 2015

PACKING, PACKING, PACKING

That's what fills my days right now!  My sewing machine is in its case, and I've packed all my quilting tools, bits and pieces.  There is still tons to do, but I know, from past experience, that I have to take my time, or I forget things.

DH took some time this morning to have a "band" practice.  They are down one man now, but the rest were feeling the loss of their time together.  They played for almost 2 hours, trying some new songs to practice for next fall when they all get together again.  DH likes to play a big variety of music, so they can fit their performances to their audience.  He as put together a few medleys - songs that everyone loves, but only know 1 verse or the chorus.  The seniors love to sing along!

Talked to my grandson this morning (although he slept through most of the conversation!)  He'll be almost 3 months old by the time I get to hold him!!!!  Can't wait!

I'm having fun packing fabric, from the new yardage that I added to leftovers that I brought to make projects (I never want to run out mid-project!)  Of course, I have a few projects that I didn't find time for - don't know where the days go!  I often with that I could sew in the evenings, but that is my time with DH!  I sometimes hand stitch, but I had very few projects requiring hand sewing this year.  I'll have to be better prepared in future.

Monday, March 30, 2015

DESIGN WALL MONDAY

I had a couple of "down days", but I'm feeling much better today, so I was able to get pictures of my latest project.  I used the remaining 4 pieces of the striped border from my Dragonfly Garden quilt to make blocks for this runner.  I lined up the prints and cut all 4 layers into 2 large squares, then cut them diagonally into 8 triangle stacks.
I took the picture in full sun so the the metallic thread would show.  Once again, I used Superior Metallic thread, and their size 14 topstitch needle to do most of the free motion quilting.  I also used some King Tut variegated thread thread to stitch the curvy lines in the sashing and yellow border.
I stitched dragonflies in each of the purple setting triangles, following the tutorial that I found on The Inbox Jaunt.

Check out all the creativity shared on Judy's blog, Patchwork Times.


Sunday, March 29, 2015

STASH REPORT SUNDAY

Fabric used this week  9.25 yards
Fabric used year to date  83.125 yards
Fabric added this week  1.25 yards
Fabric added year to date  67.75 yards
Fabric used year to date  20.375 yards

I completed 2 baby quilts made from printed panels, ready to donate to my guild's community quilts program.  
I was straightening up my sewing room, and found the leftover pieces of the border strips from the dragonfly quilt that I made recently.  Rather than put them away, I decided to use them, and made blocks for a table runner.  I added yellow sashing and green cornerstones, and used purple setting triangles.   It looks like a lovely Easter table runner now, instead of leftover fabric stored on a shelf!

Check out others' reports at Judy's blog, Patchwork Times.
 

Wednesday, March 25, 2015

TWO MORE BABY QUILTS

The weather has been hot and humid, and I don't feel like working for long periods - but I still want to quilt, so I pulled 2 more quilt panels from my stash and completed 2 more baby quilts.  I can work on these in short spurts, and I don't have to concentrate on cutting!

I even had some striped fabric to use for binding.....

Monday, March 23, 2015

DESIGN WALL MONDAY

Once again, I have nothing on my design wall!  I just stitched binding to two baby quilt panels, that I had quilted, and plan to stitch it down by hand during some TV watching with DH tonight!
Just for some more colour, here are 2 more pictures of flowers from the Epcot Flower and Garden Festival.
Now I have to figure out what other small projects I can complete before I have to start packing up to head north!


Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, March 22, 2015

STASH REPORT SUNDAY

Fabric used this week  2 yards
Fabric used year to date  73.875 yards
Fabric added this week  0 yards  
Fabric added year to date  61.5 yards
Net used 12.375 yards

As our southern winter season comes to a close, I find it harder and harder to find time to quilt.  So many of the activities are coming to a close, and there are many pot luck dinners, and other get-togethers, before many of us head north for the summer.

Yesterday we joined a group in St. Cloud for a Canadian night dinner and dance.  The group was celebrating the 50th anniversary of our flag!  DH and friends entertained with music and a few jokes thrown in for good luck.  The food was wonderful, and the dance floor was full!  Donations were made to a local charity that provides food for children on the lunch program at school, sending home a tote bag with enough to last the weekend.  They also pay fees for school outings, so all the students can attend!

I managed to squeeze in 2 more cloth books for our grandson, but I do have 2 baby quilts basted, and one partially quilted too!

 The pictures are from a recent trip to Epcot to enjoy the flower and garden festival.

See others' progress shared at Judy's blog, Patchwork Times. 

Monday, March 16, 2015

DESIGN WALL MONDAY

Nothing new on my design wall today, but here are pictures of my finishes this week....



Two more cloth books

And here is Dragonfly Garden, soon to be residing with my son and daughter-in-law in their new home.


Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, March 15, 2015

STASH REPORT SUNDAY

Fabric used this week  10.375 yards
Fabric used year to date  71.875 yards
Fabric added this week  0 yards
Fabric added year to date  61.5 yards
Net used 10.375 yards

Only took 2 1/2 months, but I'm finally into the black!  Now to keep it there.....  I completed my Dragonfly Garden quilt this week, and also stitched 2 cloth books for our grandson - he'll be 2 months old this week!
I had fun on my quilt group outing, and amazingly, came home with no fabric!
 This is the centre block of the quilt.  Again, I had chosen a panel with 8 blocks, so had to add another.

I thought I had enough of the border stripe to make mitered corners, but the stripe was so wide, I ran short.

I add corner blocks instead, enlarging the corner of the centre block and matching the colours.  This gave me a bit more room for some interesting quilting.
I inserted strips of gradated fabric between the rows of blocks, and was able to use Superior King Tut variegated thread, colour 921 - Cleopatra, to add more colour.
The dragonflies were all outlined in Superior Metallic thread, colour #25, variegated gold.


Head over to Judy's blog, Patchwork Times, to see others' reports.

Thursday, March 12, 2015

BACK TO QUILTING

Our annual outing with my quilt group was a great success.  We went out for lunch, then visited a large Joann's and 2 quilt shops while wending our way home!

A member of my first online quilting group, at Recreation, Crafts, Textiles, Quilting, called, and was able to come and join our group for the day.  We knew each other online, and had met twice before when she was in my area.  We spent most of our time catching up on our quilting adventures, as well as family news.  My group members asked if we were sisters?  We look quite a bit alike, and have sons around the same age!

There were quite a few parcels loaded into the 4 full vehicles, although I resisted this time.  I didn't want to go back into the red on my next stash report!  I'm surprised at how fast the winter has passed by - we only have 3 more quilting Wednesdays!  It is always bitter sweet to say good-bye to all my quilting friends, as I never know how many will return in the fall.....

I know I'll enjoy returning north, even if there is still a bit of snow.  I'll get to hold my new grandson for the first time, and there is tons of work to do to prepare for my guild's quilt show in June, including machine quilting a BOM quilt from blocks that have been handed in over the winter!

Monday, March 9, 2015

DESIGN WALL MONDAY

Here are a couple of pictures of the quilting on my mystery quilt.  Still waiting for help to take pictures of a couple of my larger projects.

 I used thread colours that blended with the fabric this time.  I love the colours and the prints in this one.  Most of the fabric was  from Connecting Threads, using a collection that was available last summer.

I used more of Superior Threads Twist thread.  With the two shades twisted together, it seemed to blend better with my fabrics.

Now my dragonfly garden quilt is being quilted - just SITD so far.


Check out all the creativity shared at Judy's blog, Patchwork Times.



Sunday, March 8, 2015

STASH REPORT SUNDAY

Used this week  15.625 yards
Used year to date  61.5 yards
 Added this week  11.5 yards
Added year to date  61.5 yards
Net used 2015  0 yards

Looks like I'm back to neutral - now if I can just stop buying fabric!
I found a deal on 3 1/2 yard cuts of fabric - less than half price, and mostly in the blues I've been collecting for an upcoming project.

After claiming yardage for my spinning star candle mats last week (just a guess), I actually drafted the pattern in EQ7, then got their estimated yardage for the three sizes, so I added 2 more yards to my report this week.  I also finished my mystery quilt, and was able to claim 13 5/8 yards for that one, so I finally broke even.

This week, my southern quilting group is having a day out.  We're heading out for lunch, then a stop at a couple of not-so-local shops before heading home.  We still have 3 more weeks together before I leave for the "warming I hope" north!  Some of them will continue to get together until the end of April, but we're anxious to get home and hold our new grandson!!!!!

Check out all the reports at Judy's blog, Patchwork Times.

Monday, March 2, 2015

DESIGN WALL MONDAY


I don't have a design wall - I usually use the floor or the living-room carpet!  I completed some candle mats, made from a pattern I found on the net (not in English).  I made the medium size first, (12 inches wide), then played with the strip sizes to maker the small and large sizes.

I use Superior Thread's Bottom Line in my bobbin when I machine quilt, using a light neutral shade that seems to blend with all my fabrics.  I used Glitter metallic thread on the top, in red, green and light gold.  It glistens in the light, but doesn't photograph well.
The small size, (8 3/4 inches), was made from some stray fat quarters, and I quilted in pink and green thread.
Then I tried these larger size mats, (15 1/2 inches), using some pieces of fabric donated to my group several years ago. 
I had fun playing with different fill-in designs in different scales.


Now I'm machine quilting my mystery quilt - pictures to come later.
Check out all the creativity shared at Judy's blog, Patchwork Times.



Sunday, March 1, 2015

STASH REPORT SUNDAY

Fabric used this week  3.5 yards
Fabric used year to date  45.875 yards
Fabric added this week  0 yards
 Fabric added year to date  50 yards
Net used 2015  -4.25 yards

I finally completed some sample candle mats that I started in November.  I saw some instructions (not in English) on the internet and tried out the method, then played with strip sizes to see what the results would be.  I was limited by the fabric I have at our southern home - most was designated for upcoming projects.  I'll probably donate these to my guild's boutique for the quilt show in June.

I'm closing the gap!

Check out others' at Judy's blog, Patchwork Times

Wednesday, February 25, 2015

EQ Block Challenge

I just came home from my afternoon quilting group, and saw the EQ block challenge, using the Fiesta line of fabrics from Michael Miller.

I had fun playing with the collection, and designed this block....

Monday, February 23, 2015

DESIGN WALL MONDAY

I certainly wish the weather would make up its mind!  My sewing room is unheated and built under the carport roof.  Earlier this week, DH opened the blinds early and I could sew by 11am.  Then when we had extra cold weather, my room didn't warm up enough to sew at all.  Suddenly, it is 83F outside, and my room became uncomfortable hot by 2pm!  This is certainly cutting into my sewing time.
I did get 3 sets of place mat tops completed.  The backings will be added when I return north in April - stash lives there....  I used a pattern called Take Four, using 4 fat quarters to make each set.

I'm still trying to decide which backing fabric to use for my dragonfly garden quilt.  It will be a large wall hanging, so I'm thinking I might use some unbleached muslin for backing - it will be against a wall for most of its life.
Check out all the creativity shared at Judy's blog, Patchwork Times.

Sunday, February 22, 2015

STASH REPORT SUNDAY

Fabric used this week  0 yards
Fabric used year to date  42.375 yards
Fabric added this week  3.5 yards
Fabric add year to date  50 yards
Net used 2015  -7.625 yards

I tried to be good at the fat quarter sale, and I picked up 3 sets of 4 to make placemats to be donated.  Then I found a cute stripe, and DH said I couldn't buy 13, so he picked up one more to make an even number!  2 sets of placemat tops are completed, but I'll wait until I return north to find backings from my stash.  I completed my Dragonfly Garden quilt top, but not sure what I want to use for backing.  My mystery quilt with my southern group is getting there - we have 2 more weeks left, and I stitched the centre together - I couldn't wait!  So......once again, lots of sewing but nothing finished!

Check out the stash reports at Judy's blog, Patchwork Times.

Monday, February 16, 2015

DESIGN WALL MONDAY

More fabric from deep in the stash - lovely dragonfly fabric.  The border print finishes 9 inches wide.

The coordinating print only had 8 blocks so I looked through the blocks in EQ7 and chose one called "sixteen points" to make the centre block.
I don't have enough border print to make a mitered border, so I've decided to make corner blocks, using a quarter block of the sixteen points design, in colours to match the 2 combinations used in the quilt center.

I plan on giving this to DS2 and DDIL for their entrance hall.  She loves dragonflies, and they have a large open staircase in their new home.

Check out all the shared creativity at Judy's blog, Patchwork Times, and at Love Laugh Quilt .

Sunday, February 15, 2015

STASH REPORT SUNDAY

Fabric used this week  6.625 yards
Fabric used year to date  42.375
Fabric added this week  0 yards
Fabric added year to date  46.5 yards
Net used 2015  -4.125 yards

I'm still in the red, but closing fast.  Unfortunately, my favourite quilt shop is having their annual fat quarter sale on Tuesday, so....
I did complete another "panel" quilt.  I've had this in my stash for a long timeI'm looking forward to completing my group's mystery quilt.  Mine is in pieces, so I have samples of each step.  I've been sewing them together after each week so I'll have the top completed as soon as possible.
My next project is using a large border print and some matching blocks that just love.  Hopefully my design idea will work!

Check out all the reports at Judy's blog, Patchwork Times.
 

Thursday, February 12, 2015

QUILTING AND BINDING COMPLETE

I completed the quilting on Tuesday, and hand stitched the binding down that evening.  I used monofilament (invisible) thread to outline all the cute blocks, then completed the quilting using Superior's King Tut thread in colour 937, called Tiny Tuts.  It is variegated in pink, blue, yellow and green - I use it often on baby quilts.  I stitched leaves in all the sashings, back and forth wiggle lines in all the yellow triangles, and gentle curves in the gray-green triangles. 

It is a shame that so many people think that monofilament thread is bad.  I've never had a problem with it, even in quilts that have been washed and dried regularly.  I love using it to give dimension to areas without adding another design detail.
 
I still have 9 more identical blocks for another project, but I think I'll work on it when I return north - I have more stash there, and can make a totally different quilt.  I'll have to think about this for a while.

Wednesday is my quilting group, and we are on week 5 of an 8 week mystery quilt.  I love seeing the pattern emerge with all the different choices of fabric.  I pin-basted another quilt panel, but DH and I are going out for the day - we need some US time!




Tuesday, February 10, 2015

SMALL QUILT TOP COMPLETED

I did  manage to complete the quilt top on Monday.  I would have quilted it as well, but we had a heavy downpour for most of the afternoon.  My sewing room is build under our carport, and even with a double aluminum roof, with insulation, it is still like working inside a bass drum when the rain is heavy.  

I did the best I could with limited stash available, and I refused to shop for more fabric!


Instead, DH and I watched a movie, and I baked chocolate chip cookies!

Today I've been competing with chain saws, as they are trimming trees in our community today!  My blinds are going to get more use on sunny days now.  I hope our air conditioning bill isn't higher this summer.....

Monday, February 9, 2015

DESIGN WALL MONDAY

I brought some cute printed blocks south, and finally decided to use them. I added sashing a multi-colour cornerstones.
I have limited stash in my southern home, but found these prints.
I plan on making 8 economy blocks, using the blue animal print in the center, and alternating between the yellow and green for the surrounding triangle pieces.  Then the blue print will be the final border.  Hope to get it completed by the end of today, although DH has been asking for some home made cookies, so......


Check out the creativity shared at Judy's blog, Patchwork Times.

Sunday, February 8, 2015

STASH REPORT SUNDAY

Fabric used this week  21.75 yards
Fabric used year to date  35.75 yards
Fabric added this week  4.5 yards
Fabric added year to date 46.5 yards
Net used 2015  -10.75 yards

I'm still in the red, but gaining!  I love it when I complete a large project and can add all the yardage at once!  I completed my Grand Illusion quilt this week, along with a table runner.  I have to wait to get a picture of the huge quilt - DH needs a friend to help hold the quilt!  I did add some fabric this week - visited a quilt shop in Melbourne FL that was close to our friends' home, and I had to have a couple of yards of lovely striped fabrics, and a few fat quarters jumped into my hand as well.....
Now I have to see what other projects I can get started.

Check out Judy's blog, Patchwork Times,  to see all the stash reports.