Wednesday, May 16, 2018

DESIGN WALL WEDNESDAY

I'm late with my report this week.  I've been busy making labels for my quilts, and preparing cloth bags with labels for each as well.  My guild's quilts show is approaching quickly.  Tomorrow I'll be running a photography session all day, to take pictures of the entries for our CD, that will be for sale at the show.  DH is my able assistant, helping with setting up stands, backdrops, lighting, etc., and he is skilled at handling quilts as well!  I think he's a keeper.

I completed a Christmas table topper - I had made one to donate to my guild's dinner in  December, and made a second top at the same time.  I quilted it, and adding binding, so it will be ready for the boutique.  I used Superior Thread's Glitter hologram mylar thread to quilt the centre, but unfortunately it doesn't photograph well.

I made a Stack n Whack quilt a while ago, and had a narrow strip, with 6 matched layers remaining.  I decided to cut it into as many 60 degree triangles as I could, and managed to make 18 blocks that measure 2 1/2 inches across.  I added a dark blue border, and pinned it to my design wall.  Last week, when I went searching for an additional border fabric, I discovered a floral stripe that had been in my stash for a long time.  It looks like it might have been from the same line of fabric......  Another item for the boutique at the quilt show in June.

I'm linking with  Small Quilts and Doll Quilts .

 

Monday, May 7, 2018

QUILT SHOW IS APPROACHING

I am and member of the Limestone Quilters Guild in Kingston Ontario.  Along with the Kingston Heirloom Quilts Guild, we are having a quilt show in June.
I've been busy with meetings, and all the jobs leading up to a successful quilt show.  DH and I are photographing all the quilts  and producing a CD for sale during the show.  We have three photography sessions scheduled - one during the day, one evening, and one on "intake day", when all the quilts have to be handed in to the show organizers.
At home, I've been adding hanging sleeves on all my entries, and have to make a cloth bag for each, labelled with my name, address, phone number, name of quilt and entry number.  I also have to make an additional label for each quilt.
DH and I signed up for several various jobs during the show set-up, the show, and the final day when all the stands and other gear heads back to our guild's storage locker.
I took some time today to make more tablecloths for my son - he works in a mental health department, and they have a lounge area for their clients.  The tables look more welcoming with a cloth on them.  I picked up a 15 yard bolt of fabric, so I can replace them when needed.
I hope to be back to a more normal blogging schedule soon!

Saturday, April 7, 2018

HOME SAFE AND SOUND

We had a pretty uneventful trip north.  Clear blue skies for the first 2 days, but strong cross winds and lots of traffic on the interstates.  There were dogwoods peeking out between the trees along the highways in South Carolina, and the redbuds joined in as we continued north.  There were a few banks of bright yellow forsythia to add to the beauty.
It was much colder on day 3!  We had grey clouds for the first half of the day, and when we got into New York state, there was snow on the fields and under the trees.   There were 3 deer and a fawn feeding on some green grass in a meadow. We had a lovely lunch before crossing the border toward home.  There was still some ice on the St. Lawrence river, but the sun began to shine as we crossed the Ivy Lee Bridge into Canada.

We turned up the heat in the house as soon as we arrived, and began emptying our van.  There were tubs, boxes, bags and various items everywhere.  We still have lots of unpacking to do, but made a quick trip to the grocery store, and then ate dinner at home!

Tomorrow I'll have to get the bins unpacked, but my sewing room will take a bit longer to get set up.  Good thing I made some blocks to embroider for the trip! 

I hope to be back to my sewing in a day or so.  I also found out that my guild meeting scheduled for the  4th was cancelled due to a serious storm, causing power outages and is rescheduled for April 13th, so I'm looking forward to seeing everyone!

Monday, April 2, 2018

PACKING DAY ONE!

I'm off to a slow start this morning.  Yesterday I unplugged my machine, cleaned all the lint out of it, and added a few drops of oil where required.  I polished it with a microfibre cloth, and I even gave the foot a clean before packing.
This morning, my machine was the first think to be packed, along with all the accessories.  I found a few more "orphan blocks and parts" and I'll be taking them north to join the others on my design wall.  I plan to use as many as I can over the summer.

I had cut up some scraps while sorting things, so they are now residing in their tubs to head north.  I have to find my list to see which rulers travel north and which stay in Florida.  I've packed my extra irons and small boards away until next fall, along with all my batting pieces, ready to make "Frankenbatts" for small projects.

I took a break after lunch to check my mail, but I have to get back at it!  Wish me luck!

Tuesday, March 27, 2018

NEARING TIME TO PACK

I've been cleaning up my sewing room, as it will soon be time to pack it all up for another season in the south.  I still had one more baby panel, and some coordinating fabric to use, so I spent the past two days making hourglass blocks to add to this pretty panel by Jacqueline Steves.  I can't remember the name of the panel, but I'm calling it Hourglass Farm!

I also worked on my version of Diamond Hill.  I decided to stop after completing the 4 applique blocks, as it will make a lovely large wall hanging.  I made some changes to the design, and added plain borders to the blocks before continuing on.
It has the binding complete, but needs quilting in the background areas.  I have stitched around all the small squares, as well as outlined all the flowers and leaves.  I think the remaining quilting will wait until it is back in my northern home, where I can concentrate of it.  It is currently pin-basted.

Saturday, March 24, 2018

STASH REPORT AND MORE

Fabric used this week  0 yards
Fabric used  year to date  48.625 yards
Fabric added this week  22.5 yards!
Fabric added year to date  62.125 yards
Net used 2018  13.5 yards!

Since we are nearing the end of our time in the south, along with many of our friends, my quilting group went on an outing on Wednesday.  We visited Brandon FL, and made a stop at the big Joanns store there (I only replace a ruler!).  After our shopping, we headed to the Cheescake Factory for lunch.  None of us had room for cheescake!!!!!  While we were waiting to be served, I was presented a lovely card, and a bag of goodies!


They had each chosen a fat quarter or two or three, and after I had time to look at all the lovely bundles, I folded them to fit on my shelves, and counted 80 fat quarters!!!!!  It is their fault that I'm back in the red again.

Now to get sewing!

We then headed to Gigi's Fabric Shop, where we were greeted by Gigi and her lovely staff.  She  gave us a tour of the shop, and offered our group 10% off all the fabric etc., that we chose to take home!  Of course, I couldn't resist.
  I picked out 2 black and white prints to add to my collection, along with some vehicles and fish for future grandson items.  That accounted for the 2.5 yards in my report.



Next Wednesday will be our last week to get together and sew before I have to pack up all my quilting stuff, and get ready to close our house for a while.  We always feel sad to return north, but we are both looking forward to getting some real grandson hugs!

This past week I finished the top of my Diamond Hill project by Esther Aliu.  I decided to only complete the 4 blocks, and I changed the sashing etc., as I want to use it as a wall hanging.  I spent a couple of days piecing a backing for this project, and then DH and I pin-basted the quilt this morning, so I hope to begin quilting it soon.  The grey fabric is leftover backing from a previous project.  The green flowered print has been in my stash for 24 years - leftover from making 5 bridesmaid dresses for my niece's wedding.  They had full skirts, cut in gored panels, and the pattern of the fabric was directional, so there were many long triangle wedges of fabric remaining.  I've made items with some of the fabric over the years, but no matter how hard I try, I just can't seem to use it all up!

Friday, March 16, 2018

CORRECTION

Thanks to a blog reader, I now have the information on my Celestial Magic quilt!

The design was by Jan Douglas Designs and the original pattern is found here!   Check out her other awesome patterns and designs while you are there.

I see that I made a couple of small changes when drawing the quilt in Electric Quilt, so not a perfect copy.  I often draw quilts that I see, to challenge myself and learn to use the awesome software better.

Wednesday, March 14, 2018

I'M CAUGHT UP!

I finally got my two quilt holders over so I could take a picture of my latest large quilt. 
Some time in the past, I used Electric Quilt to draw this design, and called it Celestial Magic.  I can't remember where I saw the quilt, when, who the designer was, so I extend my apologies to all.  I often see a quilt and make a drawing of it in my software, so I can play with colour, switch blocks and easily re-size.

I made a receiving blanket for our next extended family member, using the tutorial from Missouri Star.  It makes a lovely, two layer flannel blanket!     


It is completely stitched by machine, which makes it a quick gift.
I used a serpentine stitch on my machine to topstitch the layers together.  I couldn't resist the cute fabric, and found the monkey print for the back and edge, that mimics the little money with the umbrella in the main fabric.












I went out to my sewing room to work on the sashing and borders for an applique project, and I hunted, but couldn't find the background fabric.  I didn't want to waste my stitching time, so I pulled this cute panel out of my bin, along with the backing flannel, and the fabric for the binding.  I pieced the batting, pin-basted, and had fun quilting this cute project.
When DH returned home, he discovered the bolt of fabric in our bedroom closet, tucked in behind the clothing.  I remember stashing it there when we were having overnight guests, and I was trying to tidy up the spare room!  Now back to the applique project!


Sunday, March 11, 2018

TWO FINISHES AND STASH REPORT

Fabric used this week  25.5 yards
Fabric used year to date  48.625 yards
Fabric added this week  0 yards
Fabric added year to date  39.625 yards
Net used 2018  9 yards

I finished two projects this week.  I made 12 thread catchers to donate to my guild's boutique at the June quilt show.  I saw a demo online, using rings cut from Pringles cans, and cardboard circles cut from a cereal box for the bottoms.  They are all hand stitched, and twist to fold to take along anywhere.  

I also finished a larger quilt, made with stash fabric, as well as some yardage that I bought at an end of the year sale.  The quilt is called "Celestial Magic", and I had drawn it using EQ7, and found the file when I was upgrading to version 8.  Of course, I didn't make a note of where I saw the quilt, so I can't give credit to the designer (bad quilter!)  I don't have a full picture of the quilt, but I did take some shots of some of the quilting.
The quilt is made of two different blocks, set on point.  The star block uses the Tri Rec ruler to make the points, and has 4-patches and a square in square centre.

The alternate block is a large 9-patch block with black sashing.  I stitched a square flower in the orange-red centre, using King Tut thread from Superior thread.
I purposely did not stitch on any of the black areas in the quilt, with the exception of the centre of the star.  All the gray areas were stitching with light grey thread.
All the small orange-red squares in the interior were stitched with swirls, and the green squares had a leaf stitched in each.
The border is simple 4-patch blocks.  The orange-red was stitched with a flower, and more leaves stitched in the green areas.  I stitched feather hooks in the gray areas, alternating right and left around the quilt.

All the quilting was stitched free motion, and I used the width of the foot to space the lines in the light gray areas - I don't have a ruler foot.
I'll have to wait until I can get our neighbour to come and help hold the quilt for a full picture.

Tuesday, March 6, 2018

I'm getting caught up!

I've finished a couple of items lately.  Two are upcoming baby gifts, so I can't show them.  I also put the final stitches in my guild's block of the month project for 2016-17.
  It finished at 76 x 92 inches, and I called it 
"Use It or Lose It!"  
I love making scrappy quilts, and years ago my DH said that to me about my huge bins of scraps.  I spent 2 summers pressing and cutting all the scraps into usable sizes, and have made many scrap quilts since!




I spent the afternoon today, filling out my entry forms, artist statements and labeling pictures to be sent to Quilts Kingston - the quilt show in Kingston ON, sponsored by the Limestone Quilters Guild, and the Kingston Heirloom Quilters June 8, 9, 10.

I've been spending my evenings hand stitching some small thread catchers for the boutique, and I've also begun quilting my second large winter quilt project.

Last week, my southern quilting group, along with some non-sewing neighbour volunteers used our Wednesday quilting time to make pillowcases for Cases for Smiles.  In four hours, we made 360 bright, colourful pillowcases for kids in local hospitals! 
 

Thursday, February 8, 2018

CUTTING AND STITCHING

I've been busy during the past two days, cutting and sewing squares and half square triangles.  I've been using Bonnie Hunter's Essential Triangle Tool.

These are the ones I cut and stitched this morning.  We left early to go to lunch with our good neighbour, Roy.

These are all the coloured squares needed for the pieced border, and some of the half square triangle units that I made yesterday.  I had to stop, as I have to cut more neutral 2 1/2 inch strips so I can continue.

Our weather has turned from cold to hot and humid, with few dry days in between.  We're having showers that just started, so my room will be too noisy to think.  I'll press all the stitched blocks later today, and see how many more I need to make.
I ordered backing fabrics for this quilt and another that is also part-way complete, so I'll serge the cut ends, and get them washed, so I'll be ready to pin-baste soon!
My Wednesday quilting group is cancelled for next week - the clubhouse is in use for a Valentines Day renewing of vows for members of our community, so I'll have an extra full day to sew.

Sunday, February 4, 2018

STASH REPORT SUNDAY

Fabric used this week  1.75 yards
Fabric used year to date  1.75 yards
Fabric added this week  5 yards
Fabric added year to date  33.625 yards
Net used 2018  -31.875 yards

I'm still in the red, but at least I have a finish!
I had fun with these blocks, but decided that I wanted to get back to other projects, so I stopped at 3, and made a runner.

I got back to work on one project.   I had made both the blocks and the alternate blocks but had to make the pieced setting triangles.  When I checked my instructions, I found that all the edges would be on the bias, so I used EQ8 to draw the block, then I divided it in half, and printed out templates for the unusual shapes, then I divided it into 4 pieces, so I could get templates for the corner triangles as well.  I spent yesterday piecing the side and corner triangles, then used the living-room carpet to lay the blocks out, then pick them up in rows for sewing.  This morning I managed to sew the rows in one direction, and then pin them in the opposite way, but it began raining, and since my sewing room is a sunroom under the carport, the rain hitting the aluminum roof was just too loud, so I came inside and reconciled my back accounts - a job I always put off!
I also received the final instructions for the borders for my guild's scrappy BOM quilt, so when I get the first one done, I'll begin stitching the borders (all pieced!) 
I'm linking up with quiltpaintcreate today to share my stash report.  

Sunday, January 28, 2018

QUILT FIXED, AND ANOTHER PROJECT!

I posted this picture of the centre of my version of my guild's BOM quilt project, and discovered that I had twisted two of the green blocks.

I spent some time with my seam ripper, un-stitching the two offending blocks and turned them, ready to sew.

Much better now!  I was surprised that I didn't see the problem when I was pinning the rows together.

This has been a strange winter for me, as I am the type of quilter who rarely has more than 2 projects on the go at the same time.  Saying that, I started another project this week, but should be able to complete it soon.


I had joined the "Slow and Steady Quilt Along by Paula Storm" group on facebook, and finally found/made time to try my favourite block - spinning star.  I like trying new methods, and this was made by paper piecing the block using freezer paper.  You can reuse the pattern many times, as you sew next to the folded freezer paper instead of through the paper, so when the block is complete, you have no paper to remove, only pop off the freezer paper pattern, and make another block!  Paula has a blog with the directions and even videos of each row, as well as suggested quilting ideas.  You have to join the facebook group to access them.
I made three blocks and added setting triangles to make a runner.  I'm off to look for a border fabric in my tiny southern stash, but I may just add binding.


I'm linking to Small Quilts and Doll Quilts.   We are currently in Ormand Beach Florida, waiting to spend the evening at Bonnie Hunter's lecture and trunk show!

Friday, January 26, 2018

OOPS!

This can happen to anyone......
I was so excited when I completed all the blocks and was able to assemble the centre of my guild's block of the month quilt.
It wasn't until I was editing the picture that I saw that 2 blocks are twisted, so today's job is to unstitch the blocks and re-sew them in the right direction!!!!!
The two green bowtie blocks need to be turned so that the neutrals form a V along the sides of the quilt!

Sunday, January 21, 2018

STASH REPORT SUNDAY

Fabric used this week 0 yards
Fabric used  year to date 0 yards
Fabric added this week 3.625 yards
Fabric added year to date 28.625  yards
Net used 2018  -28.625 yards

Further into the hole this week - I picked up some packages of batik charm squares, and a couple of yards of clearance fabric.

I finished stitching all the clamshell blocks together, and trimmed them ready to be used in a tote bag.
I completed the alternate blocks for my quilt project - 12 of them, but then noticed that the pieced setting triangles would leave bias edges, so had to plan a new cutting chart to have straight of grain along the outside.
Began getting caught up on my guild's BOM project.  Completed 6 of the 8 blocks, but need to make more half square triangle units to complete the last two.
Pulled fabric from my stash to make a rainbow star block sample - I'll be doing a demo on Wednesday.
I still have to edit the pictures from my guild's last meeting and get them posted to the website!
Lots to get done this week! 
I'm linking up with others at quiltpaintcreate.

Tuesday, January 16, 2018

DESIGN WALL MONDAY - TUESDAY AGAIN!

I seem to have difficulty meeting my deadlines lately!  DH and I were out all day Monday, and I was too tired (or lazy), to get this posted!

I've been working on several projects, but managed to get the first 20 blocks of my latest partly sewn, and pinned for the final stitching.  I still have 12 alternate blocks to stitch, as well as the pieced setting triangle for this "on point" setting.
Note my "leader and ender" square in my machine.  If I have been piecing, there is always one under the presser foot.

I've also been working on Esther Aliu's Diamond Hill pattern, and just completed hand applique on the 4th block of this wonderful project.
I think I enjoyed making this block the most!

I have been neglecting my guild's Block of the Month, and I'll have to dedicate some time to making the final set of blocks and stitching the centre of the quilt together.  My panel of clamshells is stitched together, and now I'm trying to decide whether to make a pillow top with it, or use it in a tote bag - a suggestion from a member in my group.   

I'm joining others at Small Quilts and Doll Quilts, to share my "design wall" today.

Sunday, January 14, 2018

STASH REPORT SUNDAY

Fabric used this week 0 yards
Fabric used year to date 0 yards
Fabric added this week 25 yards
Fabric added year to date 25 yards
Net used 2018  -25 yards  
 
No change this week.  I had a busy week, which included my demo on various ways to machine and hand stitch clamshells together.   I was surprised how many tried the techniques, with some making a quick trip home for scrap fabric so they could join in the fun!
 
My own project has made some progress.  I completed all the pieced units of the first block design.  I have sewn the together in one direction, and all the blocks are pinned ready to stitch.  Unfortunately, our weather became very cold, damp and rainy again, and my sewing room (a sunroom under the carport roof) was just too cold to sit and sew.  Today the sun is shining, and my room has finally warmed up, so I'm off to sew the blocks!
 
I'm linking up with  quiltpaintcreate to share my stash report.

Tuesday, January 9, 2018

DESIGN WALL MONDAY - OOPS TUESDAY!

I spent some time over the weekend playing with clamshells.  I chose 5 inch squares from a stack of leftover charm squares, and cut a stack of clams.  I tried the traditional way of machine piecing first.

I matched the notches, and used a ton of pins and very carefully stitched, making sure that all the fullness was eased in, and no tucks were formed.  I pressed the seam allowances toward the piece just added.



Then I tried a modified English paper piecing method.  The first row was stitched together.  Then I spent time turning the top edge to the back, using a freezer paper template that I had ironed to the back of each piece. 
 I spread some Best Pressed along the seam allowance of the top, and then, using a stylus to help, pressed the edge to the back with my iron.  When the block was cool, I pulled the freezer paper away.  When I had all the pieces ready for the first row, I used dots of liquid washable glue to attach the row, pressing the row dry with my iron.  I top-stitched the row, using a narrow, short blind hem stitch, with monofilament (invisible) thread in the needle, and regular thread in the bobbin.  I adjusted the thread tension so that none of the bobbin thread showed on the top. 
I like both methods, but decided to use the second method to make my pillow top.
I also began cutting pieces for a new large quilt project.  I am using some fabric from my stash, but also added a few yards to my stash at the end of the year to fill out my selection.  The first block is a pieced 9-patch, and I have completed the first part - simple 4-patch blocks, and started on the second part - a square or diamond in a square unit.  The orange/red is new - a fossil fern that called to me from the quilt shop shelf!
I'm connecting with others at Small Quilts an Doll Quilts this week.

Sunday, January 7, 2018

STASH REPORT SUNDAY

Fabric used this week 0 yards
Fabric used year to date 0 yards
Fabric added this week 25 yards
Fabric added year to date 25 yards
Net used 2018  -25 yards 

This is the first time I've started the year in a minus situation!  I only report fabric as used when I complete a project - otherwise I have difficulty remembering what has been reported already!
My guild is always looking for printed panels to make baby quilts - but want them 36" x width of fabric.  Most of the manufacturers have switched to 24" x WoF, and coordinating fabric is required to complete a project.  I shopped online at Marshall Dry Goods, and ordered 25 different panels.  These will be on my stash report until I return home in the spring, and hand some of them over to our community quilts coordinator!
I've been working on an applique project, but nothing to report so far.  
I am also doing a demo of clamshells for my southern quilting group, and have been busy cutting pieces , using an assortment of leftover charm squares (5 inch).  I have stitched two together, and with much pinning, have machine stitched one to the bottom curve.  Next I'm going to try the "English paper pieced method", turning the top edge over a paper template, and then top stitching the shell in place by machine.  Either way is very time consuming!
I'm linking up with quiltpaintcreate to share my weekly report.

Thursday, January 4, 2018

SEWING IN COLD FLORIDA

I'm a Canadian, spending the winter in Florida, and I'm not really complaining about the cold weather here - it will soon pass.  During our time as an Air Force family, we lived as far north as the lower edge of Hudsons Bay, and spent time in various locations in Ontario, as well as 2 years on Vancouver Island.

My sewing room is in a bonus room under the carport.  It is unheated and has a ceiling fan to help with the heat and humidity.  DH knew I planned to spend time there today, so he went out early, and opened the blinds so the sun would warm the space!  By 11am it was toasty, and I spent time cutting fabric, and working to lay out my latest applique project.  I had prepared all the pieces, and was using drops of school glue (washable), along with an iron, to attach the stems and pieces to the background square.  Now I'll have plenty of hand sewing work to do while we watch TV in the evenings.  I also washed all my new fabric, so it will be ready to begin a new project tomorrow.